Permit: TR-UTL-0525-00767
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1931 W KING AV
Address NEW:
1931 W KING AV
Apply Date:
05/12/2025
Applicant:
Description:
work order 2998001, 1931 w king st 13-14-22 sw, new service install at the north side of the lot in asphalt, 8lf. ca
Permit Reviews
Permit Number - TR-UTL-0525-00767
Permit Status: Complete
Permit Description: work order 2998001, 1931 w king st 13-14-22 sw, new service install at the north side of the lot in asphalt, 8lf. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00767
Permit Status: Complete
Permit Description: work order 2998001, 1931 w king st 13-14-22 sw, new service install at the north side of the lot in asphalt, 8lf. ca
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/14/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00767
Permite Description: work order 2998001, 1931 w king st 13-14-22 sw, new service install at the north side of the lot in asphalt, 8lf. ca
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 06/16/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00767
Permit Description: work order 2998001, 1931 w king st 13-14-22 sw, new service install at the north side of the lot in asphalt, 8lf. ca
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/21/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/21/2026 | TRSP - ROW - Final | Passed |