Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1709 S CRAYCROFT RD
Apply Date:
05/12/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" fire protection service

Permit Reviews

Permit Number - TR-UTL-0525-00760
Permit Status: Complete
Permit Description: Installing a 4" fire protection service
Start Date Submittal Complete Date Status  
05/12/2025 RIGHT-OF-WAY REVIEW v.1 05/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00760
Permit Status: Complete
Permit Description: Installing a 4" fire protection service
Total Outstanding Activity Conditions - 4
Date Name
05/13/2025 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
05/13/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/13/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/13/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00760
Permit Description: Installing a 4" fire protection service
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/29/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Megan over the phone for a pre-activity meeting. She stated work will begin either this Friday or the beginning of next week. Work is being done in the dirt alley behind business.
06/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work in dirt alley
06/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed Setup follows TCP
06/05/2025 TRSP - ROW - Final Passed work is complete. All work was performed in the dirt of an alley and alley has been returned to good condition