Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
05/12/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 60x3 trench to replace gas line service in row in asphalt and dirt.

Permit Reviews

Permit Number - TR-UTL-0525-00757
Permit Status: Complete
Permit Description: Excavating a 60x3 trench to replace gas line service in row in asphalt and dirt.
Start Date Submittal Complete Date Status  
05/12/2025 RIGHT-OF-WAY REVIEW v.1 05/12/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00757
Permit Status: Complete
Permit Description: Excavating a 60x3 trench to replace gas line service in row in asphalt and dirt.
Total Outstanding Activity Conditions - 1
Date Name
05/12/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00757
Permit Description: Excavating a 60x3 trench to replace gas line service in row in asphalt and dirt.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Juan over the phone. Work to begin within a week or two he will call me the day before work begins so that I can schedule a traffic control set up inspection.
06/27/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
06/27/2025 TRSP - ROW - Final Passed Work is complete