Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7391 E TANQUE VERDE RD
Apply Date:
05/01/2025
Applicant:
Andrea Charles
Description:
Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.

Permit Reviews

Permit Number - TR-UTL-0525-00725
Permit Status: Inspections
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Start Date Submittal Complete Date Status  
05/01/2025 RIGHT-OF-WAY REVIEW v.1 05/01/2025 REQUIRES RESUBMIT Review Details
05/08/2025 RIGHT-OF-WAY REVIEW v.4 05/08/2025 APPROVED Review Details
05/07/2025 RIGHT-OF-WAY REVIEW v.3 05/07/2025 REQUIRES RESUBMIT Review Details
05/05/2025 RIGHT-OF-WAY REVIEW v.2 05/07/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00725
Permit Status: Inspections
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Outstanding Activity Conditions - 5
Date Name
05/01/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/01/2025 Traffic control set-up approved between 9AM - 3:30PM
05/08/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
05/08/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/08/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0525-00725
Permite Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/24/2025 TRSP - ROW - Final N/A Failed

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0525-00725
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/05/2025 TRSP - ROW - Field Change Request Passed
06/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/24/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
06/24/2025 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1403400 - 7391 E TANQUE VERDE RD_V1.PDF DOCUMENTS VIEW
7391 E TANQUE VERDE RD TUCSON AZ 85715 - EDWARD JONES - CITY OF TUCSON PERMIT MAP_V1.PDF DOCUMENTS VIEW
TCP-REVISED 3_V1.PDF DOCUMENTS VIEW