Permit: TR-UTL-0525-00725
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
7391 E TANQUE VERDE RD
Address NEW:
7391 E TANQUE VERDE RD
Apply Date:
05/01/2025
Applicant:
Andrea Charles
Description:
Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Permit Reviews
Permit Number - TR-UTL-0525-00725
Permit Status: Inspections
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/01/2025 | REQUIRES RESUBMIT |
| 05/08/2025 | RIGHT-OF-WAY REVIEW v.4 | 05/08/2025 | APPROVED |
| 05/07/2025 | RIGHT-OF-WAY REVIEW v.3 | 05/07/2025 | REQUIRES RESUBMIT |
| 05/05/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/07/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00725
Permit Status: Inspections
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/01/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 05/01/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/08/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/08/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/08/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00725
Permite Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | TRSP - ROW - Final | N/A | Failed |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00725
Permit Description: Tie point will be existing fiber splice case inside underground vault. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place 1650' of new strand and lash 1650' of 48ct fiber over 7 spans. Bore 200' of 2" conduit at a depth of 3'. Run 200' of 48 ct fiber. Place new vault. Proof 450' of existing conduit, pull 450' of 48ct fiber. Place new vault.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/05/2025 | TRSP - ROW - Field Change Request | Passed | ||
| 06/24/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/24/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed |