Permit: TR-UTL-0524-01089
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2423 E KLEINDALE RD
Address NEW:
2423 E KLEINDALE RD
Apply Date:
05/31/2024
Applicant:
Chelsey Bolinger
Description:
P.099178B (KAHNA) - (Previously approved/expired permit TR-UTL-0124-00012) - TRENCH 3' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,662' AERIAL CABLE. PLACE (1) HANDHOLE
Permit Reviews
Permit Number - TR-UTL-0524-01089
Permit Status: Complete
Permit Description: P.099178B (KAHNA) - (Previously approved/expired permit TR-UTL-0124-00012) - TRENCH 3' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,662' AERIAL CABLE. PLACE (1) HANDHOLE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/11/2024 | APPROVED |
| 05/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01089
Permit Status: Complete
Permit Description: P.099178B (KAHNA) - (Previously approved/expired permit TR-UTL-0124-00012) - TRENCH 3' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,662' AERIAL CABLE. PLACE (1) HANDHOLE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/03/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/03/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01089
Permit Description: P.099178B (KAHNA) - (Previously approved/expired permit TR-UTL-0124-00012) - TRENCH 3' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,662' AERIAL CABLE. PLACE (1) HANDHOLE
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work already completed | |
| 09/20/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work already completed | |
| 09/20/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/20/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | work already completed | |
| 09/20/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/20/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |