Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3993 N CAMPBELL AV
Apply Date:
05/31/2024
Applicant:
Chelsey Bolinger
Description:
P.099157A (KAHNA) - (CONTINUATION of permit TR-UTL-0324-00484) - BORE 969' & TRENCH 22’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. OVERLASH 2,926’ OF AERIAL FIBER CABLE.

Permit Reviews

Permit Number - TR-UTL-0524-01087
Permit Status: Complete
Permit Description: P.099157A (KAHNA) - (CONTINUATION of permit TR-UTL-0324-00484) - BORE 969' & TRENCH 22’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. OVERLASH 2,926’ OF AERIAL FIBER CABLE.
Start Date Submittal Complete Date Status  
05/31/2024 RIGHT-OF-WAY REVIEW v.1 06/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0524-01087
Permit Status: Complete
Permit Description: P.099157A (KAHNA) - (CONTINUATION of permit TR-UTL-0324-00484) - BORE 969' & TRENCH 22’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. OVERLASH 2,926’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 4
Date Name
05/31/2024 PAVEMENT MORATORIUM
05/31/2024 PRE-CON/PAVEMENT/SIDEWALK
05/31/2024 Traffic control set-up approved between 9AM - 3:30PM
09/16/2024 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0524-01087
Permit Description: P.099157A (KAHNA) - (CONTINUATION of permit TR-UTL-0324-00484) - BORE 969' & TRENCH 22’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. OVERLASH 2,926’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/26/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/17/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
12/17/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
12/17/2024 TRSP - ROW - Final/Close-Out Passed
12/17/2024 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.099157A - CITY OF TUCSON PLANS - 05-31-2024_V1.PDF DOCUMENTS VIEW
P.099157A - CITY OF TUCSON TCP - 05-31-2024_V1.PDF DOCUMENTS VIEW