Permit: TR-UTL-0524-01075
Permit Details
Apply Date:
05/30/2024
Applicant:
Tucson Water
Description:
Installing new 8" Fire Hydrant, 1" & 2" water services with 2" Potable meter & 3/4" irrigation meter, 16" DVA, and 16" valve. 24 hour closure requested.
Permit Reviews
Permit Number - TR-UTL-0524-01075
Permit Status: Issued
Permit Description: Installing new 8" Fire Hydrant, 1" & 2" water services with 2" Potable meter & 3/4" irrigation meter, 16" DVA, and 16" valve. 24 hour closure requested.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/30/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/04/2024 | REQUIRES RESUBMIT |
06/04/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01075
Permit Status: Issued
Permit Description: Installing new 8" Fire Hydrant, 1" & 2" water services with 2" Potable meter & 3/4" irrigation meter, 16" DVA, and 16" valve. 24 hour closure requested.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/30/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
06/12/2024 | The following extended traffic control set-up times were approved: |
06/12/2024 | ENGINEER NOTES |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0524-01075
Permite Description: Installing new 8" Fire Hydrant, 1" & 2" water services with 2" Potable meter & 3/4" irrigation meter, 16" DVA, and 16" valve. 24 hour closure requested.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | no barricades called in for inspection. |
07/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | no precon held work has been completed |
07/11/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | no density reports given |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0524-01075
Permit Description: Installing new 8" Fire Hydrant, 1" & 2" water services with 2" Potable meter & 3/4" irrigation meter, 16" DVA, and 16" valve. 24 hour closure requested.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
07/11/2024 | TRSP - ROW - Final/Close-Out | Passed |