Permit: TR-UTL-0524-01067
Permit Details
Apply Date:
05/29/2024
Applicant:
DOONE BAKER
Description:
P.06623A (KAHNA) - Previously approved/expired permit TR-UTL-0324-00631 - BORE 1,221' & TRENCH 152'. PLACE (7) FIBER SAI CABINET, HANDHOLE, FLOWERPOT. PLACE (5) ANCHORS/DOWN GUYS. OVERLASH 2,572' OF AERIAL FIBER CABLE
Permit Reviews
Permit Number - TR-UTL-0524-01067
Permit Status: Withdrawn
Permit Description: P.06623A (KAHNA) - Previously approved/expired permit TR-UTL-0324-00631 - BORE 1,221' & TRENCH 152'. PLACE (7) FIBER SAI CABINET, HANDHOLE, FLOWERPOT. PLACE (5) ANCHORS/DOWN GUYS. OVERLASH 2,572' OF AERIAL FIBER CABLE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01067
Permit Status: Withdrawn
Permit Description: P.06623A (KAHNA) - Previously approved/expired permit TR-UTL-0324-00631 - BORE 1,221' & TRENCH 152'. PLACE (7) FIBER SAI CABINET, HANDHOLE, FLOWERPOT. PLACE (5) ANCHORS/DOWN GUYS. OVERLASH 2,572' OF AERIAL FIBER CABLE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/29/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
05/29/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
05/29/2024 | Traffic/Mobility Control Plan (MCP) approved as submitted. |