Permit: TR-UTL-0524-01057
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8980 E TANQUE VERDE RD
Address NEW:
8980 E TANQUE VERDE RD
Apply Date:
05/28/2024
Applicant:
Cox Communications
Description:
Cox to pull thru 430', and bore 119' and install equipment for catv commercial business tie. Cox to continue onto private.
Permit Reviews
Permit Number - TR-UTL-0524-01057
Permit Status: Complete
Permit Description: Cox to pull thru 430', and bore 119' and install equipment for catv commercial business tie.
Cox to continue onto private.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01057
Permit Status: Complete
Permit Description: Cox to pull thru 430', and bore 119' and install equipment for catv commercial business tie.
Cox to continue onto private.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/29/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/29/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 05/29/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01057
Permite Description: Cox to pull thru 430', and bore 119' and install equipment for catv commercial business tie.
Cox to continue onto private.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01057
Permit Description: Cox to pull thru 430', and bore 119' and install equipment for catv commercial business tie.
Cox to continue onto private.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/11/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/31/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 07/31/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/31/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/31/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |