Permit: TR-UTL-0524-01048
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7458 E MONTECITO DR
Address NEW:
7458 E MONTECITO DR
Apply Date:
05/24/2024
Applicant:
DOONE BAKER
Description:
P.067189C (KAHNA) - OVERLASH 4391' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0524-01048
Permit Status: Complete
Permit Description: P.067189C (KAHNA) - OVERLASH 4391' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01048
Permit Status: Complete
Permit Description: P.067189C (KAHNA) - OVERLASH 4391' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/28/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 05/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/28/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/28/2024 | NOTE: WORK IS ALLEY BEHIND E MONTECITO DR, S TURQUOISE PL, S LA VISTA PL, & S LA VILLA PL - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01048
Permite Description: P.067189C (KAHNA) - OVERLASH 4391' OF AERIAL FIBER CABLE.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | barricade still on shoulder of roadway of site |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01048
Permit Description: P.067189C (KAHNA) - OVERLASH 4391' OF AERIAL FIBER CABLE.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/06/2025 | TRSP - ROW - Barricade Takedown | Passed | All traffic control removed | |
| 12/18/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 08/01/2025 | TRSP - ROW - Final/Close-Out | Passed |