Permit: TR-UTL-0524-01046
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
634 S MARVIN AV
Address NEW:
634 S MARVIN AV
Apply Date:
05/24/2024
Applicant:
Chelsey Bolinger
Description:
P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0524-01046
Permit Status: Complete
Permit Description: P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01046
Permit Status: Complete
Permit Description: P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/28/2024 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 05/28/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 05/28/2024 | NOTE: WORK IS IN ALLEY BEHIND S MARVIN AV, E 17TH PL, E ELI PL, E PRINCETON PL, & E PRINCETON DR - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01046
Permit Description: P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/10/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 12/10/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |