Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-01042
Permit Details
Apply Date:
05/24/2024
Applicant:
Bobby Robbins
Description:
2 5x5 bellholes in dirt/blktop front on Starr Pass Blvd for crews to pothole/repair gas line
Permit Reviews
Permit Number - TR-UTL-0524-01042
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front on Starr Pass Blvd for crews to pothole/repair gas line
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01042
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front on Starr Pass Blvd for crews to pothole/repair gas line
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
05/28/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
05/28/2024 | |
05/28/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
05/28/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanos@tucsonaz.gov or James Degrood at James.degrood@tucsonaz.gov prior to start of work |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01042
Permit Description: 2 5x5 bellholes in dirt/blktop front on Starr Pass Blvd for crews to pothole/repair gas line
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/04/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
07/29/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
07/29/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
07/29/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
07/29/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
07/29/2024 | TRSP - ROW - Final/Close-Out | Passed |