Permit: TR-UTL-0524-01035
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9495 E SPEEDWAY BL
Address NEW:
9495 E SPEEDWAY BL
Apply Date:
05/22/2024
Applicant:
Cox Communications
Description:
COX TO BORE 229',TRENCH 10' AND PULL THRU 5' OF EXISTING CONDUIT TO POTHOLE AND PLACE NEW VAULT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0524-01035
Permit Status: Complete
Permit Description: COX TO BORE 229',TRENCH 10' AND PULL THRU 5' OF EXISTING CONDUIT TO POTHOLE AND PLACE NEW VAULT FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-01035
Permit Status: Complete
Permit Description: COX TO BORE 229',TRENCH 10' AND PULL THRU 5' OF EXISTING CONDUIT TO POTHOLE AND PLACE NEW VAULT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/23/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 05/23/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/23/2024 | TR-UTL-0524-01035 |
| 05/23/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-01035
Permit Description: COX TO BORE 229',TRENCH 10' AND PULL THRU 5' OF EXISTING CONDUIT TO POTHOLE AND PLACE NEW VAULT FOR SYSTEM TIE
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/03/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/03/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 09/03/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 09/25/2024 | TRSP - ROW - Final/Close-Out | Passed |