Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-00999
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3803 N COUNTRY CLUB RD
Address NEW:
3803 N COUNTRY CLUB RD
Apply Date:
05/17/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.099096A - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1621' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0524-00999
Permit Status: Complete
Permit Description: KAHNA P.099096A - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1621' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00999
Permit Status: Complete
Permit Description: KAHNA P.099096A - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1621' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/20/2024 | ROW Permit is only allowed for City of Tucson Limits. |
| 05/20/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/20/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00999
Permit Description: KAHNA P.099096A - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1621' OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 11/01/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/29/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 10/02/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |