Permit: TR-UTL-0524-00997
Permit Details
Apply Date:
05/17/2024
Applicant:
Think Safety Inc
Description:
COX TO PULL THRU EXISTING CONDUIT AND BORE 29' TO POTHOLE AND INTERCEPT EXISTING CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0524-00997
Permit Status: Complete
Permit Description: COX TO PULL THRU EXISTING CONDUIT AND BORE 29' TO POTHOLE AND INTERCEPT EXISTING CONDUIT FOR SYSTEM TIE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/20/2024 | REQUIRES RESUBMIT |
05/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00997
Permit Status: Complete
Permit Description: COX TO PULL THRU EXISTING CONDUIT AND BORE 29' TO POTHOLE AND INTERCEPT EXISTING CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/20/2024 | BUS STOP/ ROUTE |
05/20/2024 | PRE-CON/PAVEMENT/SIDEWALK |
05/20/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00997
Permite Description: COX TO PULL THRU EXISTING CONDUIT AND BORE 29' TO POTHOLE AND INTERCEPT EXISTING CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | vault not backfilled, re inspection required |
09/09/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | backfill and barricade removal remain incomplete |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00997
Permit Description: COX TO PULL THRU EXISTING CONDUIT AND BORE 29' TO POTHOLE AND INTERCEPT EXISTING CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/14/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | landscape backfilled around vault | |
11/14/2024 | TRSP - ROW - Final/Close-Out | Passed | all inspections passed, site fully restored and completed |