Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
05/17/2024
Applicant:
Ben Lozano
Description:
Place 1320 ft aerial fiber on existing power poles, Dirt trench with 2" conduit 1252 ft, bore 366 ft with 2" conduit and remove and replace 3'x7' section of asphalt, for First Digital fiber

Permit Reviews

Permit Number - TR-UTL-0524-00994
Permit Status: Complete
Permit Description: Place 1320 ft aerial fiber on existing power poles, Dirt trench with 2" conduit 1252 ft, bore 366 ft with 2" conduit and remove and replace 3'x7' section of asphalt, for First Digital fiber
Start Date Submittal Complete Date Status  
05/17/2024 RIGHT-OF-WAY REVIEW v.1 05/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0524-00994
Permit Status: Complete
Permit Description: Place 1320 ft aerial fiber on existing power poles, Dirt trench with 2" conduit 1252 ft, bore 366 ft with 2" conduit and remove and replace 3'x7' section of asphalt, for First Digital fiber
Total Outstanding Activity Conditions - 2
Date Name
05/17/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/17/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0524-00994
Permite Description: Place 1320 ft aerial fiber on existing power poles, Dirt trench with 2" conduit 1252 ft, bore 366 ft with 2" conduit and remove and replace 3'x7' section of asphalt, for First Digital fiber
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/29/2024 TRSP - ROW - AERIAL INSTALLATION N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0524-00994
Permit Description: Place 1320 ft aerial fiber on existing power poles, Dirt trench with 2" conduit 1252 ft, bore 366 ft with 2" conduit and remove and replace 3'x7' section of asphalt, for First Digital fiber
Total Completed Inspections - 6
Date Description Inspector Results Comments
05/29/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/28/2024 TRSP - ROW - Barricade - Setup/Routine Passed
06/28/2024 TRSP - ROW - Barricade Takedown Passed
06/28/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
06/28/2024 TRSP - ROW - Final/Close-Out Passed
06/28/2024 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
600 N PANTANO CONSTRUCTION PRINT_V1.PDF DOCUMENTS VIEW
600 N PANTANO TCP-1-MODEL_V1.PDF DOCUMENTS VIEW
600 N PANTANO TCP-2-MODEL_V1.PDF DOCUMENTS VIEW
600 N PANTANO TCP-3-MODEL_V1.PDF DOCUMENTS VIEW