Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-00992
Permit Details
Apply Date:
05/17/2024
Applicant:
CAITLIN RIPLEY
Description:
S of 1145 S Antelop meadows loop, cox to place new supervented ped and tie to existing. Pull 520' to existing ped. Cox to add 1 vault and r&R 1 ped west of 3610 W Starr Pass blvd.
Permit Reviews
Permit Number - TR-UTL-0524-00992
Permit Status: Complete
Permit Description: S of 1145 S Antelop meadows loop, cox to place new supervented ped and tie to existing. Pull 520' to existing ped.
Cox to add 1 vault and r&R 1 ped west of 3610 W Starr Pass blvd.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00992
Permit Status: Complete
Permit Description: S of 1145 S Antelop meadows loop, cox to place new supervented ped and tie to existing. Pull 520' to existing ped.
Cox to add 1 vault and r&R 1 ped west of 3610 W Starr Pass blvd.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
05/17/2024 | Traffic control set-up approved between 9AM - 3:30PM |
05/17/2024 | OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. |
05/17/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
05/20/2024 | Supporting equipment |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00992
Permit Description: S of 1145 S Antelop meadows loop, cox to place new supervented ped and tie to existing. Pull 520' to existing ped.
Cox to add 1 vault and r&R 1 ped west of 3610 W Starr Pass blvd.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/01/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/06/2024 | TRSP - ROW - Final/Close-Out | Passed |