Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-00987
Permit Details
Apply Date:
05/17/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.099097C - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1109' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0524-00987
Permit Status: Complete
Permit Description: KAHNA P.099097C - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1109' OF AERIAL FIBER CABLE.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/12/2024 | RIGHT-OF-WAY REVIEW v.3 | 06/16/2024 | APPROVED |
05/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/24/2024 | REQUIRES RESUBMIT |
06/04/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/04/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00987
Permit Status: Complete
Permit Description: KAHNA P.099097C - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1109' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/17/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
05/17/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00987
Permit Description: KAHNA P.099097C - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 1109' OF AERIAL FIBER CABLE.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/02/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
11/29/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
11/04/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
11/29/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
10/02/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |