Permit: TR-UTL-0524-00985
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2480 E CALLE DE LUPE
Address NEW:
2480 E CALLE DE LUPE
Apply Date:
05/17/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.099097A - BORE 1549' & TRENCH 49' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 2749' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0524-00985
Permit Status: Complete
Permit Description: KAHNA P.099097A - BORE 1549' & TRENCH 49' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 2749' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00985
Permit Status: Complete
Permit Description: KAHNA P.099097A - BORE 1549' & TRENCH 49' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 2749' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/17/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/17/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00985
Permit Description: KAHNA P.099097A - BORE 1549' & TRENCH 49' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (19) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT & 2749' OF AERIAL FIBER CABLE.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/15/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/29/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 09/03/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |