Permit: TR-UTL-0524-00964
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1656 N COLUMBUS BL
Address NEW:
1656 N COLUMBUS BL
Apply Date:
05/14/2024
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/sidewalk front for crews to repair gas line
Permit Reviews
Permit Number - TR-UTL-0524-00964
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/sidewalk front for crews to repair gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00964
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/sidewalk front for crews to repair gas line
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/14/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/14/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/14/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00964
Permit Description: 2 5x5 bellholes in dirt/sidewalk front for crews to repair gas line
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/24/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/24/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/24/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/24/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/24/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/24/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |