Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2802 N 1ST AV
Address NEW:
2802 N 1ST AV
Apply Date:
05/12/2024
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
PRJ268554-1 COX TO OVERLASH 177' OF AERIAL FIBER, AND PULL 241' THROUGH EXISTING CONDUIT FOR SYSTEM TIE IN.

Permit Reviews

Permit Number - TR-UTL-0524-00952
Permit Status: Complete
Permit Description: PRJ268554-1 COX TO OVERLASH 177' OF AERIAL FIBER, AND PULL 241' THROUGH EXISTING CONDUIT FOR SYSTEM TIE IN.
Start Date Submittal Complete Date Status  
05/13/2024 RIGHT-OF-WAY REVIEW v.1 05/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0524-00952
Permit Status: Complete
Permit Description: PRJ268554-1 COX TO OVERLASH 177' OF AERIAL FIBER, AND PULL 241' THROUGH EXISTING CONDUIT FOR SYSTEM TIE IN.
Total Outstanding Activity Conditions - 2
Date Name
05/13/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/13/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0524-00952
Permit Description: PRJ268554-1 COX TO OVERLASH 177' OF AERIAL FIBER, AND PULL 241' THROUGH EXISTING CONDUIT FOR SYSTEM TIE IN.
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/26/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/09/2024 TRSP - ROW - Barricade - Setup/Routine Passed
09/09/2024 TRSP - ROW - Barricade Takedown Passed
09/09/2024 TRSP - ROW - Final/Close-Out Passed
09/09/2024 TRSP - ROW - AERIAL INSTALLATION Passed