Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-00932
Permit Details
Apply Date:
05/08/2024
Applicant:
DOONE BAKER
Description:
P.215731 - Remove existing aerial fiber, dig (4) pits and place (4) new peds
Permit Reviews
Permit Number - TR-UTL-0524-00932
Permit Status: Complete
Permit Description: P.215731 - Remove existing aerial fiber, dig (4) pits and place (4) new peds
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00932
Permit Status: Complete
Permit Description: P.215731 - Remove existing aerial fiber, dig (4) pits and place (4) new peds
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
05/08/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
05/08/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
05/08/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
05/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00932
Permit Description: P.215731 - Remove existing aerial fiber, dig (4) pits and place (4) new peds
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/29/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/05/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
09/05/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/29/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/05/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
09/05/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/05/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |