Permit: TR-UTL-0524-00929
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3725 E FORT LOWELL RD
Address NEW:
3725 E FORT LOWELL RD
Apply Date:
05/08/2024
Applicant:
Desert Barricades LLC
Description:
(Continuation of Existing Work) WO T90474 - POLE CHANGE OUT (LOW-20) (EXISTING PERMIT TR-UTL-1023-02848 SET TO EXPIRE 05/11/24) Permit update 8/7/2024: Renewal for 90 days.
Permit Reviews
Permit Number - TR-UTL-0524-00929
Permit Status: Complete
Permit Description: (Continuation of Existing Work) WO T90474 - POLE CHANGE OUT (LOW-20) (EXISTING PERMIT TR-UTL-1023-02848 SET TO EXPIRE 05/11/24)
Permit update 8/7/2024: Renewal for 90 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00929
Permit Status: Complete
Permit Description: (Continuation of Existing Work) WO T90474 - POLE CHANGE OUT (LOW-20) (EXISTING PERMIT TR-UTL-1023-02848 SET TO EXPIRE 05/11/24)
Permit update 8/7/2024: Renewal for 90 days.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/08/2024 | City Limits Only ROW Permit is only allowed for City of Tucson Limits. |
| 05/08/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/08/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/08/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00929
Permit Description: (Continuation of Existing Work) WO T90474 - POLE CHANGE OUT (LOW-20) (EXISTING PERMIT TR-UTL-1023-02848 SET TO EXPIRE 05/11/24)
Permit update 8/7/2024: Renewal for 90 days.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/08/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/08/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/08/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |