Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0524-00928
Permit Details
Apply Date:
05/07/2024
Applicant:
Tucson Water
Description:
wo#2676193 5901 e 14th st 14-14-13 ne replace hydrant s/sd of lot in dirt 8LF/sc
Permit Reviews
Permit Number - TR-UTL-0524-00928
Permit Status: Complete
Permit Description: wo#2676193 5901 e 14th st 14-14-13 ne replace hydrant s/sd of lot in dirt 8LF/sc
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00928
Permit Status: Complete
Permit Description: wo#2676193 5901 e 14th st 14-14-13 ne replace hydrant s/sd of lot in dirt 8LF/sc
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
05/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
05/08/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
05/08/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
05/08/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanos@tucsonaz.gov or James Degrood at james.degrood@tucsonaz.gov prior to start of work |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00928
Permit Description: wo#2676193 5901 e 14th st 14-14-13 ne replace hydrant s/sd of lot in dirt 8LF/sc
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
06/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/10/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/10/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
06/10/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |