Permit: TR-UTL-0524-00900
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4215 N ORACLE RD
Address NEW:
4215 N ORACLE RD
Apply Date:
05/06/2024
Applicant:
Andrea Charles
Description:
Tie point will be existing splice case on pole. Over-lash 1820ft of 96ct fiber over 11 spans. Bore 185ft of 2in conduit at a depth of 3ft, run 185ft of 24ct fiber. Place new vault. Bore 175ft of 2in conduit at a depth of 3ft, run 175ft of 24ct fiber. Update - Request for 30- day extension as of 6/28/2024
Permit Reviews
Permit Number - TR-UTL-0524-00900
Permit Status: Complete
Permit Description: Tie point will be existing splice case on pole. Over-lash 1820ft of 96ct fiber over 11 spans. Bore 185ft of 2in conduit at a depth of 3ft, run 185ft of 24ct fiber. Place new vault. Bore 175ft of 2in conduit at a depth of 3ft, run 175ft of 24ct fiber.
Update - Request for 30- day extension as of 6/28/2024
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/06/2024 | REQUIRES RESUBMIT |
| 05/07/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0524-00900
Permit Status: Complete
Permit Description: Tie point will be existing splice case on pole. Over-lash 1820ft of 96ct fiber over 11 spans. Bore 185ft of 2in conduit at a depth of 3ft, run 185ft of 24ct fiber. Place new vault. Bore 175ft of 2in conduit at a depth of 3ft, run 175ft of 24ct fiber.
Update - Request for 30- day extension as of 6/28/2024
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/06/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00900
Permite Description: Tie point will be existing splice case on pole. Over-lash 1820ft of 96ct fiber over 11 spans. Bore 185ft of 2in conduit at a depth of 3ft, run 185ft of 24ct fiber. Place new vault. Bore 175ft of 2in conduit at a depth of 3ft, run 175ft of 24ct fiber.
Update - Request for 30- day extension as of 6/28/2024
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | TRSP - ROW - Final/Close-Out | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0524-00900
Permit Description: Tie point will be existing splice case on pole. Over-lash 1820ft of 96ct fiber over 11 spans. Bore 185ft of 2in conduit at a depth of 3ft, run 185ft of 24ct fiber. Place new vault. Bore 175ft of 2in conduit at a depth of 3ft, run 175ft of 24ct fiber.
Update - Request for 30- day extension as of 6/28/2024
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/15/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 05/13/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/31/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/31/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/31/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/31/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |