Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9430 E STELLA RD
Address NEW:
9430 E STELLA RD
Apply Date:
05/31/2023
Applicant:
Cameron Bonner
Description:
322045 - Site 3 - Remove cleanout 9627*9-1 and install new terminal manhole. Install Approximately 215 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH 9627-09 per PCRWRD standard detail 212

Permit Reviews

Permit Number - TR-UTL-0523-01688
Permit Status: Complete
Permit Description: 322045 - Site 3 - Remove cleanout 9627*9-1 and install new terminal manhole. Install Approximately 215 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH 9627-09 per PCRWRD standard detail 212
Start Date Submittal Complete Date Status  
05/31/2023 RIGHT-OF-WAY REVIEW v.1 06/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0523-01688
Permit Status: Complete
Permit Description: 322045 - Site 3 - Remove cleanout 9627*9-1 and install new terminal manhole. Install Approximately 215 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH 9627-09 per PCRWRD standard detail 212
Total Outstanding Activity Conditions - 5
Date Name
06/01/2023 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/01/2023 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
06/01/2023 The following extended traffic control set-up times were approved:
06/01/2023 Traffic Control set-up approved between 7AM - 5PM
06/01/2023 Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual-

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01688
Permit Description: 322045 - Site 3 - Remove cleanout 9627*9-1 and install new terminal manhole. Install Approximately 215 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH 9627-09 per PCRWRD standard detail 212
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/14/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/23/2023 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DB 67782 - PAGE 3 - 9430 E STELLA RD - BUMPOUT - ALLEY CLOSURE - 322045_V1.PDF DOCUMENTS VIEW
322045 - SITE 3 FMP MAP (9430 E STELLA RD)_V1.PDF DOCUMENTS VIEW