Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
300 E RIVER RD
Address NEW:
300 E RIVER RD
Apply Date:
05/17/2023
Applicant:
Andrea Charles
Description:
Tie point will existing ped with fiber case inside vault. Trench 660ft of 2" conduit towards new ped. Run 660ft of 72ct fiber.Place new vault.

Permit Reviews

Permit Number - TR-UTL-0523-01569
Permit Status: Complete
Permit Description: Tie point will existing ped with fiber case inside vault. Trench 660ft of 2" conduit towards new ped. Run 660ft of 72ct fiber.Place new vault.
Start Date Submittal Complete Date Status  
06/20/2023 RIGHT-OF-WAY REVIEW v.3 07/07/2023 APPROVED Review Details
05/17/2023 RIGHT-OF-WAY REVIEW v.1 05/17/2023 REQUIRES RESUBMIT Review Details
06/07/2023 RIGHT-OF-WAY REVIEW v.2 06/07/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0523-01569
Permit Status: Complete
Permit Description: Tie point will existing ped with fiber case inside vault. Trench 660ft of 2" conduit towards new ped. Run 660ft of 72ct fiber.Place new vault.
Total Outstanding Activity Conditions - 4
Date Name
05/17/2023 BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AND/OR BEAPAULUS AT 520-206-8826 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/17/2023 Traffic control set-up approved between 9AM - 3:30PM
05/17/2023 Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual-
05/17/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01569
Permit Description: Tie point will existing ped with fiber case inside vault. Trench 660ft of 2" conduit towards new ped. Run 660ft of 72ct fiber.Place new vault.
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/14/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
REVISED DESIGN FOR CITY OF TUCSON_V1.PDF DOCUMENTS VIEW
WYCO520---REVISED_V1.PDF DOCUMENTS VIEW