Permit: TR-UTL-0523-01565
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
354 E BILBY RD
Address NEW:
354 E BILBY RD
Apply Date:
05/17/2023
Applicant:
Judy Boyer
Description:
2 5x5 bellholes in dirt/blktop front for crews to abadon gas line
Permit Reviews
Permit Number - TR-UTL-0523-01565
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to abadon gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0523-01565
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to abadon gas line
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/17/2023 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/17/2023 | Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual- |
| 05/17/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0523-01565
Permite Description: 2 5x5 bellholes in dirt/blktop front for crews to abadon gas line
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) | |
| 08/16/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0523-01565
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to abadon gas line
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/23/2024 | TRSP - ROW - Notice of Completion | Passed |