Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5101 E 22ND ST
Address NEW:
5101 E 22ND ST
Apply Date:
05/10/2023
Applicant:
Judy Boyer
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line

Permit Reviews

Permit Number - TR-UTL-0523-01532
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line
Start Date Submittal Complete Date Status  
05/10/2023 RIGHT-OF-WAY REVIEW v.1 05/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0523-01532
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line
Total Outstanding Activity Conditions - 4
Date Name
05/10/2023 BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AND/OR BEAPAULUS AT 520-206-8826 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/10/2023 Traffic control set-up approved between 9AM - 3:30PM
05/10/2023 Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual-
05/10/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01532
Permite Description: 2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/27/2023 TRSP - ROW - SITE INSPECTION N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01532
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/23/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/28/2023 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
5101 E 22ND-_V1.PDF DOCUMENTS VIEW
5101 E 22ND ST_V1.PDF DOCUMENTS VIEW