Permit: TR-UTL-0523-01524
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
212 E AVIATION DR
Address NEW:
212 E AVIATION DR
Apply Date:
05/09/2023
Applicant:
IAN HEIDINGER
Description:
EXCAVTE (1) 25'X3' TRENCH IN ASPHALT STREET (E AVIATION DR) FOR GAS SERVICE REPLACEMENT. THIS JOB FALLS UNDER PROP 411 PRIORITY.
Permit Reviews
Permit Number - TR-UTL-0523-01524
Permit Status: Complete
Permit Description: EXCAVTE (1) 25'X3' TRENCH IN ASPHALT STREET (E AVIATION DR) FOR GAS SERVICE REPLACEMENT. THIS JOB FALLS UNDER PROP 411 PRIORITY.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/09/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/11/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0523-01524
Permit Status: Complete
Permit Description: EXCAVTE (1) 25'X3' TRENCH IN ASPHALT STREET (E AVIATION DR) FOR GAS SERVICE REPLACEMENT. THIS JOB FALLS UNDER PROP 411 PRIORITY.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/10/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0523-01524
Permit Description: EXCAVTE (1) 25'X3' TRENCH IN ASPHALT STREET (E AVIATION DR) FOR GAS SERVICE REPLACEMENT. THIS JOB FALLS UNDER PROP 411 PRIORITY.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/18/2023 | TRSP - ROW - SITE INSPECTION | Passed |