Permit: TR-UTL-0523-01509
Permit Details
Apply Date:
05/09/2023
Applicant:
Cox Communications
Description:
COX TO OVERLASH 1629' OF FIBER AND TRENCH 56' TO CONTINUE ONTO PRIVATE PROPERTY FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0523-01509
Permit Status: Issued
Permit Description: COX TO OVERLASH 1629' OF FIBER AND TRENCH 56' TO CONTINUE ONTO PRIVATE PROPERTY FOR SYSTEM TIE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/09/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/11/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0523-01509
Permit Status: Issued
Permit Description: COX TO OVERLASH 1629' OF FIBER AND TRENCH 56' TO CONTINUE ONTO PRIVATE PROPERTY FOR SYSTEM TIE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/10/2023 | Traffic control set-up approved between 9AM - 3:30PM |
05/10/2023 | Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual- |
05/10/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0523-01509
Permit Description: COX TO OVERLASH 1629' OF FIBER AND TRENCH 56' TO CONTINUE ONTO PRIVATE PROPERTY FOR SYSTEM TIE
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |