Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
902 W CALLE SEVILLA
Apply Date:
05/08/2023
Applicant:
Description:
2518934 902 w Calle Sevilla 15-13-14NE install for irrigation east side of lot on east side of s Basconia ave; 6lf asphalt

Permit Reviews

Permit Number - TR-UTL-0523-01491
Permit Status: Complete
Permit Description: 2518934 902 w Calle Sevilla 15-13-14NE install for irrigation east side of lot on east side of s Basconia ave; 6lf asphalt
Start Date Submittal Complete Date Status  
05/08/2023 RIGHT-OF-WAY REVIEW v.1 05/09/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0523-01491
Permit Status: Complete
Permit Description: 2518934 902 w Calle Sevilla 15-13-14NE install for irrigation east side of lot on east side of s Basconia ave; 6lf asphalt
Date Description Comments
05/09/2023 ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/09/2023 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01491
Permite Description: 2518934 902 w Calle Sevilla 15-13-14NE install for irrigation east side of lot on east side of s Basconia ave; 6lf asphalt
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/21/2023 TRSP - ROW - SITE INSPECTION N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0523-01491
Permit Description: 2518934 902 w Calle Sevilla 15-13-14NE install for irrigation east side of lot on east side of s Basconia ave; 6lf asphalt
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/20/2024 TRSP - ROW - Bituminous Treatment Passed
07/15/2024 TRSP - ROW - SITE INSPECTION Passed
09/09/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/09/2025 TRSP - ROW - Notice of Completion Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW