Permit: TR-UTL-0523-01470
Permit Details
Apply Date:
05/05/2023
Applicant:
Think Safety Inc
Description:
COX TO 1090' OVERLASH NEW 48CT FIBER CABLE, RISER DOWN POLE. 15' TRENCH WEST PLACING 4" CONDUIT TO BUILDER PLACED 2" CONDUIT SWEEP. SET NEW COX VAULT IN ROW OVER SWEEP. Head NORTH , 248' PULL NEW 48CT FIBER CABLE THROUGH EXISTING CONDUIT. SET NEW COX VAULT OVER BUILDER PLACED 2" CONDUITS SWEEPS.
Permit Reviews
Permit Number - TR-UTL-0523-01470
Permit Status: Complete
Permit Description: COX TO 1090' OVERLASH NEW 48CT FIBER CABLE, RISER DOWN POLE. 15' TRENCH WEST PLACING 4" CONDUIT TO BUILDER PLACED 2" CONDUIT SWEEP. SET NEW COX VAULT IN ROW OVER SWEEP. Head NORTH , 248' PULL NEW 48CT FIBER CABLE THROUGH EXISTING CONDUIT. SET NEW COX VAULT OVER BUILDER PLACED 2" CONDUITS SWEEPS.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/05/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0523-01470
Permit Status: Complete
Permit Description: COX TO 1090' OVERLASH NEW 48CT FIBER CABLE, RISER DOWN POLE. 15' TRENCH WEST PLACING 4" CONDUIT TO BUILDER PLACED 2" CONDUIT SWEEP. SET NEW COX VAULT IN ROW OVER SWEEP. Head NORTH , 248' PULL NEW 48CT FIBER CABLE THROUGH EXISTING CONDUIT. SET NEW COX VAULT OVER BUILDER PLACED 2" CONDUITS SWEEPS.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/05/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0523-01470
Permit Description: COX TO 1090' OVERLASH NEW 48CT FIBER CABLE, RISER DOWN POLE. 15' TRENCH WEST PLACING 4" CONDUIT TO BUILDER PLACED 2" CONDUIT SWEEP. SET NEW COX VAULT IN ROW OVER SWEEP. Head NORTH , 248' PULL NEW 48CT FIBER CABLE THROUGH EXISTING CONDUIT. SET NEW COX VAULT OVER BUILDER PLACED 2" CONDUITS SWEEPS.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/07/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/10/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
08/08/2023 | TRSP - ROW - Recurring | Passed |