Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1500 W HILLSIDE DR
Apply Date:
04/30/2026
Applicant:
Description:
REAPPLYING FOR EXPIRED PERMIT - TR-UTL-0126-00095 - COX TO TRENCH 15' AND BORE 15' TO PLACE CONDUIT FOR CATV SERVICE DROP. FIBER/COAX TO BE PULLED AFTER CONDUIT IS PLACED.

Permit Reviews

Permit Number - TR-UTL-0426-00754
Permit Status: Complete
Permit Description: REAPPLYING FOR EXPIRED PERMIT - TR-UTL-0126-00095 - COX TO TRENCH 15' AND BORE 15' TO PLACE CONDUIT FOR CATV SERVICE DROP. FIBER/COAX TO BE PULLED AFTER CONDUIT IS PLACED.
Start Date Submittal Complete Date Status  
05/01/2026 RIGHT-OF-WAY REVIEW v.1 05/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00754
Permit Status: Complete
Permit Description: REAPPLYING FOR EXPIRED PERMIT - TR-UTL-0126-00095 - COX TO TRENCH 15' AND BORE 15' TO PLACE CONDUIT FOR CATV SERVICE DROP. FIBER/COAX TO BE PULLED AFTER CONDUIT IS PLACED.
Total Outstanding Activity Conditions - 7
Date Name
05/04/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
05/04/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
05/04/2026 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/04/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property
05/04/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
05/04/2026 Traffic Control set-up approved between 7AM - 5PM
05/04/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0426-00754
Permit Description: REAPPLYING FOR EXPIRED PERMIT - TR-UTL-0126-00095 - COX TO TRENCH 15' AND BORE 15' TO PLACE CONDUIT FOR CATV SERVICE DROP. FIBER/COAX TO BE PULLED AFTER CONDUIT IS PLACED.
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/31/2026 TRSP - ROW - Barricade - Setup/Routine Passed all work completed closing permit
08/31/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Precon was held a while back. This is an old permit closing permit.
08/31/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Precon was held a while back. This is an old permit closing permit.
08/31/2026 TRSP - ROW - Final Passed All work has been completed. Full restoration of the asphalt patch has been correctly done closing permit.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
A1C - 1500 W HILLSIDE DR - HARD CLOSURE - 26-001 A1C_V1.PDF DOCUMENTS VIEW
PRJ310405-1_TUCSON_V1.PDF DOCUMENTS VIEW