Permit: TR-UTL-0426-00745
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
3002 S MISSION RD
Address NEW:
3002 S MISSION RD
Apply Date:
04/29/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T160735 - TEP TO PARK AND WORK IN THE ROW TO REMOVE AND INSTALL OH PRIMARY CONDUCTOR SPANS FROM THE ORANGE CIRCLED POLE. REMOVING THE OH 3-PHASE SPAN RUNNING FROM TNE ORANGE CIRCLED POLE #6 TO POLE #7, AND INSTALLING A NEW 3-PHASE OH PRIMARY SPAN TO POLE 305 FROM THE ORANGE CIRCLED POLE #6. WO T160734 TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM POLE #7 TO EXISTING J2 VALV-5 AND INSTALL (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM NEW POLE 305 TO EXISTING J2 VALV-5.
Permit Reviews
Permit Number - TR-UTL-0426-00745
Permit Status: Fees due
Permit Description: WO T160735 - TEP TO PARK AND WORK IN THE ROW TO REMOVE AND INSTALL OH PRIMARY CONDUCTOR SPANS FROM THE ORANGE CIRCLED POLE. REMOVING THE OH 3-PHASE SPAN RUNNING FROM TNE ORANGE CIRCLED POLE #6 TO POLE #7, AND INSTALLING A NEW 3-PHASE OH PRIMARY SPAN TO POLE 305 FROM THE ORANGE CIRCLED POLE #6.
WO T160734 TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM POLE #7 TO EXISTING J2 VALV-5 AND INSTALL (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM NEW POLE 305 TO EXISTING J2 VALV-5.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/07/2026 | APPROVED |
| 04/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/04/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00745
Permit Status: Fees due
Permit Description: WO T160735 - TEP TO PARK AND WORK IN THE ROW TO REMOVE AND INSTALL OH PRIMARY CONDUCTOR SPANS FROM THE ORANGE CIRCLED POLE. REMOVING THE OH 3-PHASE SPAN RUNNING FROM TNE ORANGE CIRCLED POLE #6 TO POLE #7, AND INSTALLING A NEW 3-PHASE OH PRIMARY SPAN TO POLE 305 FROM THE ORANGE CIRCLED POLE #6.
WO T160734 TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM POLE #7 TO EXISTING J2 VALV-5 AND INSTALL (1) SPAN OF 3-PHASE UG 1/0 PRIMARY CONDUCTOR FROM NEW POLE 305 TO EXISTING J2 VALV-5.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 04/30/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/30/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/30/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/30/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/06/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/06/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 05/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/06/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |