Permit: TR-UTL-0426-00744
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1910 N STONE AV
Address NEW:
1910 N STONE AV
Apply Date:
04/29/2026
Applicant:
Cox Communications
Description:
PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0426-00744
Permit Status: Issued
Permit Description: PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00744
Permit Status: Issued
Permit Description: PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/30/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/30/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/30/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/30/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/05/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |