Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1910 N STONE AV
Address NEW:
1910 N STONE AV
Apply Date:
04/29/2026
Applicant:
Cox Communications
Description:
PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE

Permit Reviews

Permit Number - TR-UTL-0426-00744
Permit Status: Issued
Permit Description: PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE
Start Date Submittal Complete Date Status  
04/29/2026 RIGHT-OF-WAY REVIEW v.1 05/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00744
Permit Status: Issued
Permit Description: PRJ315291-1 COX TO PULL THROUGH 200' AND OVERLASH 212' TO INSTALL NEW CATV FOR SYSTEM TIE
Total Outstanding Activity Conditions - 5
Date Name
04/30/2026 Traffic control set-up approved between 9AM - 3:30PM
04/30/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/30/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/30/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/05/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ315291-1 TCP_V1.PDF DOCUMENTS VIEW
PRJ315291-1 TUCSON SKETCH_V1.PDF DOCUMENTS VIEW