Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
255 W FLORES ST
Address NEW:
255 W FLORES ST
Apply Date:
04/28/2026
Applicant:
Dominic Moreno
Description:
Need Approval for Gas connected.

Permit Reviews

Permit Number - TR-UTL-0426-00739
Permit Status: Issued
Permit Description: Need Approval for Gas connected.
Start Date Submittal Complete Date Status  
04/29/2026 RIGHT-OF-WAY REVIEW v.1 05/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00739
Permit Status: Issued
Permit Description: Need Approval for Gas connected.
Total Outstanding Activity Conditions - 8
Date Name
04/29/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/29/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY.
04/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/29/2026 Traffic Control set-up approved between 7AM - 5PM
05/04/2026
05/04/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/04/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
05/04/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
REVISED SITE PLAN_V1.PDF DOCUMENTS VIEW