Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4197 S GOODALL PL
Apply Date:
04/28/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WOs T139158, T169719. TEP TO PARK AND WORK IN THE ROW TO INSTALL (2) PME9's, (4) J6's, (1) 6" FEEDER RISER, (1) PULL UG FEEDER CONDUCTOR IN EXISTING 6" CONDUITS, PULL 3-PHASE UG PRIMARY CONDUCTORS AND SINGLE PHASE UG PRIMARY CONDUCTORS INTO EXISTING 2.5" AND 4" CONDUITS, AND REMOVE 3-PHASE OH PRIMARY CONDUCTORS, POLES, GUYING & ANCHORS, AND SINGLE PHASE 2.5" PRIMARY RISERS. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS. WO's T139158 (FEEDER CONDUCTOR, PME's, 6" FEEDER RISER, AND J6's), T139158 (POLE REMOVAL, OH PRIMARY CONDUCTOR REMOVAL, & GUYING REMOVAL), AND T169719 (J2 INSTALLATIONS, 2.5" PRIMARY RISER REMOVALS, CUT OVERS TO NEW J2's).

Permit Reviews

Permit Number - TR-UTL-0426-00736
Permit Status: Inspections
Permit Description: WOs T139158, T169719. TEP TO PARK AND WORK IN THE ROW TO INSTALL (2) PME9's, (4) J6's, (1) 6" FEEDER RISER, (1) PULL UG FEEDER CONDUCTOR IN EXISTING 6" CONDUITS, PULL 3-PHASE UG PRIMARY CONDUCTORS AND SINGLE PHASE UG PRIMARY CONDUCTORS INTO EXISTING 2.5" AND 4" CONDUITS, AND REMOVE 3-PHASE OH PRIMARY CONDUCTORS, POLES, GUYING & ANCHORS, AND SINGLE PHASE 2.5" PRIMARY RISERS. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS. WO's T139158 (FEEDER CONDUCTOR, PME's, 6" FEEDER RISER, AND J6's), T139158 (POLE REMOVAL, OH PRIMARY CONDUCTOR REMOVAL, & GUYING REMOVAL), AND T169719 (J2 INSTALLATIONS, 2.5" PRIMARY RISER REMOVALS, CUT OVERS TO NEW J2's).
Start Date Submittal Complete Date Status  
04/28/2026 RIGHT-OF-WAY REVIEW v.1 05/01/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00736
Permit Status: Inspections
Permit Description: WOs T139158, T169719. TEP TO PARK AND WORK IN THE ROW TO INSTALL (2) PME9's, (4) J6's, (1) 6" FEEDER RISER, (1) PULL UG FEEDER CONDUCTOR IN EXISTING 6" CONDUITS, PULL 3-PHASE UG PRIMARY CONDUCTORS AND SINGLE PHASE UG PRIMARY CONDUCTORS INTO EXISTING 2.5" AND 4" CONDUITS, AND REMOVE 3-PHASE OH PRIMARY CONDUCTORS, POLES, GUYING & ANCHORS, AND SINGLE PHASE 2.5" PRIMARY RISERS. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS. WO's T139158 (FEEDER CONDUCTOR, PME's, 6" FEEDER RISER, AND J6's), T139158 (POLE REMOVAL, OH PRIMARY CONDUCTOR REMOVAL, & GUYING REMOVAL), AND T169719 (J2 INSTALLATIONS, 2.5" PRIMARY RISER REMOVALS, CUT OVERS TO NEW J2's).
Total Outstanding Activity Conditions - 6
Date Name
04/30/2026 Traffic Control set-up approved between 7AM - 5PM
04/30/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/01/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/01/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/01/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
05/01/2026 Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0426-00736
Permite Description: WOs T139158, T169719. TEP TO PARK AND WORK IN THE ROW TO INSTALL (2) PME9's, (4) J6's, (1) 6" FEEDER RISER, (1) PULL UG FEEDER CONDUCTOR IN EXISTING 6" CONDUITS, PULL 3-PHASE UG PRIMARY CONDUCTORS AND SINGLE PHASE UG PRIMARY CONDUCTORS INTO EXISTING 2.5" AND 4" CONDUITS, AND REMOVE 3-PHASE OH PRIMARY CONDUCTORS, POLES, GUYING & ANCHORS, AND SINGLE PHASE 2.5" PRIMARY RISERS. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS. WO's T139158 (FEEDER CONDUCTOR, PME's, 6" FEEDER RISER, AND J6's), T139158 (POLE REMOVAL, OH PRIMARY CONDUCTOR REMOVAL, & GUYING REMOVAL), AND T169719 (J2 INSTALLATIONS, 2.5" PRIMARY RISER REMOVALS, CUT OVERS TO NEW J2's).
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/10/2026 TRSP - ROW - Barricade - Setup/Routine N/A Not Ready awaiting job status update from Ramey
07/10/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Not Ready awaiting job status update from Ramey
07/10/2026 TRSP - ROW - AERIAL INSTALLATION N/A Not Ready awaiting job status update from Ramey
07/10/2026 TRSP - ROW - Final N/A Not Ready awaiting job status update from Ramey

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0426-00736
Permit Description: WOs T139158, T169719. TEP TO PARK AND WORK IN THE ROW TO INSTALL (2) PME9's, (4) J6's, (1) 6" FEEDER RISER, (1) PULL UG FEEDER CONDUCTOR IN EXISTING 6" CONDUITS, PULL 3-PHASE UG PRIMARY CONDUCTORS AND SINGLE PHASE UG PRIMARY CONDUCTORS INTO EXISTING 2.5" AND 4" CONDUITS, AND REMOVE 3-PHASE OH PRIMARY CONDUCTORS, POLES, GUYING & ANCHORS, AND SINGLE PHASE 2.5" PRIMARY RISERS. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS. WO's T139158 (FEEDER CONDUCTOR, PME's, 6" FEEDER RISER, AND J6's), T139158 (POLE REMOVAL, OH PRIMARY CONDUCTOR REMOVAL, & GUYING REMOVAL), AND T169719 (J2 INSTALLATIONS, 2.5" PRIMARY RISER REMOVALS, CUT OVERS TO NEW J2's).
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/11/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Ramey, job does not have a mobilization start date yet, but the day-to-day manager will be in contact once date is determined. Estimated one and a half week job duration, TP will ensure completion before 7/10 permit expiration date or submit extension.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
AERIAL MAP T139158 - T169719_V1.PDF DOCUMENTS VIEW
DB 72454 - 4197 S GOODALL PL - VARIOUS - T139158-T169719_V1.PDF DOCUMENTS VIEW