Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3900 N SUN TRAN BL
Apply Date:
04/28/2026
Applicant:
Ilana Galluzzo
Description:
CIT OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement. Request for 30 Day Renewal as of 08/16/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0426-00731
Permit Status: Issued
Permit Description: CIT OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement. Request for 30 Day Renewal as of 08/16/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
04/28/2026 RIGHT-OF-WAY REVIEW v.1 05/14/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00731
Permit Status: Issued
Permit Description: CIT OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement. Request for 30 Day Renewal as of 08/16/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 10
Date Name
04/30/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/30/2026 Traffic control set-up approved between 9AM - 3:30PM
04/30/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/30/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/04/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way
05/04/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
05/04/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
05/04/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/04/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/04/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0426-00731
Permit Description: CIT OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement. Request for 30 Day Renewal as of 08/16/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
Date Description Inspector Results Comments
05/26/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed This is a Sunrain southwest gas project existing continue documents see uploads, and contact NPL for other information on other documents. They're waiting on survey and blue stake prior to uploading some more documents to verify.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW