Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3901 E WHITTIER ST
Apply Date:
04/27/2026
Applicant:
ANGEL MORALES
Description:
P.355275 OVERBUILD BORE 616' AND TRENCH 48' TO PLACE CONDUIT AND FIBER CABLE PULL 196' OF FIBER CABLE THROUGH EXISTING CONDUIT PLACE 1155' OF AERIAL FIBER CABLE PLACE 2 HHS AND 3 PEDS

Permit Reviews

Permit Number - TR-UTL-0426-00728
Permit Status: Fees due
Permit Description: P.355275 OVERBUILD BORE 616' AND TRENCH 48' TO PLACE CONDUIT AND FIBER CABLE PULL 196' OF FIBER CABLE THROUGH EXISTING CONDUIT PLACE 1155' OF AERIAL FIBER CABLE PLACE 2 HHS AND 3 PEDS
Start Date Submittal Complete Date Status  
04/28/2026 RIGHT-OF-WAY REVIEW v.1 05/06/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00728
Permit Status: Fees due
Permit Description: P.355275 OVERBUILD BORE 616' AND TRENCH 48' TO PLACE CONDUIT AND FIBER CABLE PULL 196' OF FIBER CABLE THROUGH EXISTING CONDUIT PLACE 1155' OF AERIAL FIBER CABLE PLACE 2 HHS AND 3 PEDS
Total Outstanding Activity Conditions - 11
Date Name
05/01/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/01/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
05/01/2026 Traffic control set-up approved between 9AM - 3:30PM
05/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/01/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/01/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
05/01/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/06/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/06/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
05/06/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/06/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14

Documents

File Name Document Type  
P.355275 - TUCSON - PERMIT DESIGN 4-20-26_V1.PDF DOCUMENTS VIEW
P.355275 AERIAL SITE MAP_V1.PDF DOCUMENTS VIEW
P.355275 TCPS_V1.PDF DOCUMENTS VIEW