Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4340 S PASEO MELODIOSO
Apply Date:
04/27/2026
Applicant:
Ilana Galluzzo
Description:
2' x 50' TRENCH IN PAVEMENT/DIRT CROSSING S MELPOMENE WAY TO INSTALL NEW GAS SERVICE (APPROX. 15' IN DIRT, APPROX 35' IN PAVEMENT).

Permit Reviews

Permit Number - TR-UTL-0426-00721
Permit Status: Complete
Permit Description: 2' x 50' TRENCH IN PAVEMENT/DIRT CROSSING S MELPOMENE WAY TO INSTALL NEW GAS SERVICE (APPROX. 15' IN DIRT, APPROX 35' IN PAVEMENT).
Start Date Submittal Complete Date Status  
04/27/2026 RIGHT-OF-WAY REVIEW v.1 04/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00721
Permit Status: Complete
Permit Description: 2' x 50' TRENCH IN PAVEMENT/DIRT CROSSING S MELPOMENE WAY TO INSTALL NEW GAS SERVICE (APPROX. 15' IN DIRT, APPROX 35' IN PAVEMENT).
Total Outstanding Activity Conditions - 7
Date Name
04/27/2026 Traffic control set-up approved between 9AM - 3:30PM
04/28/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
04/28/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
04/28/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
04/28/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
04/28/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses during construction
04/28/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0426-00721
Permit Description: 2' x 50' TRENCH IN PAVEMENT/DIRT CROSSING S MELPOMENE WAY TO INSTALL NEW GAS SERVICE (APPROX. 15' IN DIRT, APPROX 35' IN PAVEMENT).
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/28/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/28/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/28/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
07/28/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
4340 S PASEO MELODIOSO 4866454_V1.PDF DOCUMENTS VIEW
4340 S PASEO MELODIOSO TCP_V1.PDF DOCUMENTS VIEW