Permit: TR-UTL-0426-00715
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
7450 E STELLA RD
Address NEW:
7450 E STELLA RD
Apply Date:
04/23/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact. 06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Permit Reviews
Permit Number - TR-UTL-0426-00715
Permit Status: Issued
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact.
06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00715
Permit Status: Issued
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact.
06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Total Outstanding Activity Conditions - 13
| Date | Name |
|---|---|
| 04/24/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/24/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 04/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/27/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 04/27/2026 | Your project work requires that you contact the DAISY EDUCATION CORP to alert them and coordinate work as needed in school zones. |
| 04/27/2026 | Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones. |
| 04/27/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 04/27/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 04/27/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 04/27/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 04/27/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0426-00715
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact.
06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Ramey, pole pull will be ready once communication line is transferred. Current status is shown as in progress. |