Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
7450 E STELLA RD
Address NEW:
7450 E STELLA RD
Apply Date:
04/23/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact. 06/30/2026 - Request for 90 Day Renewal as of 07/12/2026

Permit Reviews

Permit Number - TR-UTL-0426-00715
Permit Status: Issued
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact. 06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Start Date Submittal Complete Date Status  
04/24/2026 RIGHT-OF-WAY REVIEW v.1 05/11/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00715
Permit Status: Issued
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact. 06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Total Outstanding Activity Conditions - 13
Date Name
04/24/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/24/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
04/24/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/24/2026 Traffic control set-up approved between 9AM - 3:30PM
04/24/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/27/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
04/27/2026 Your project work requires that you contact the DAISY EDUCATION CORP to alert them and coordinate work as needed in school zones.
04/27/2026 Your project work requires that you contact the Tucson Unified School District to alert them and coordinate work as needed in school zones.
04/27/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/27/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
04/27/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
04/27/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
04/27/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0426-00715
Permit Description: WO T180560. TEP will remove 1 pole from ROW. Dig a 2’X2’-6’ deep hole with no sidewalk impact. 06/30/2026 - Request for 90 Day Renewal as of 07/12/2026
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/07/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Ramey, pole pull will be ready once communication line is transferred. Current status is shown as in progress.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72435 - 7450 E STELLA RD - MIDBLOCK - T180560_V1.PDF DOCUMENTS VIEW
T180560 MAP_V1.PDF DOCUMENTS VIEW