Permit: TR-UTL-0426-00709
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1901 W CALLE DEL REPOSO
Address NEW:
1901 W CALLE DEL REPOSO
Apply Date:
04/23/2026
Applicant:
Tucson Electric Power
Description:
WO T151035- TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) (1) POLE-WOOD CL H2 60FT AND REPLACE/INSTALL (3) POLES STEEL EMERGENCY 80FT. LOCATIONS ARE CIRCLED IN NEON GREEN ON AERIAL VIEW DOCUMENT. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS
Permit Reviews
Permit Number - TR-UTL-0426-00709
Permit Status: Complete
Permit Description: WO T151035- TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) (1) POLE-WOOD CL H2 60FT AND REPLACE/INSTALL (3) POLES STEEL EMERGENCY 80FT. LOCATIONS ARE CIRCLED IN NEON GREEN ON AERIAL VIEW DOCUMENT. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00709
Permit Status: Complete
Permit Description: WO T151035- TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) (1) POLE-WOOD CL H2 60FT AND REPLACE/INSTALL (3) POLES STEEL EMERGENCY 80FT. LOCATIONS ARE CIRCLED IN NEON GREEN ON AERIAL VIEW DOCUMENT. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/23/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 04/23/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/23/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/23/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0426-00709
Permit Description: WO T151035- TEP TO PARK AND WORK IN THE ROW TO REMOVE (1) (1) POLE-WOOD CL H2 60FT AND REPLACE/INSTALL (3) POLES STEEL EMERGENCY 80FT. LOCATIONS ARE CIRCLED IN NEON GREEN ON AERIAL VIEW DOCUMENT. NO LINEAR EXCAVATION WILL BE PERFORMED BY TEP CREWS
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/07/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | all work from the TEP side of this permit has been completed | |
| 08/07/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all work from the TEP side of this permit has been completed | |
| 08/07/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 08/07/2026 | TRSP - ROW - Final | Passed | Homework from the TEP side of this permit has been completed |