Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
4140 E 22ND ST
Address NEW:
4140 E 22ND ST
Apply Date:
04/23/2026
Applicant:
Cox Communications
Description:
PRJ314460-1: Cox to Overlash 1,750 of existing CATV fiber, intercept & pull thru 675' of existing fiber for system tie.

Permit Reviews

Permit Number - TR-UTL-0426-00705
Permit Status: Fees due
Permit Description: PRJ314460-1: Cox to Overlash 1,750 of existing CATV fiber, intercept & pull thru 675' of existing fiber for system tie.
Start Date Submittal Complete Date Status  
05/14/2026 RIGHT-OF-WAY REVIEW v.3 05/15/2026 APPROVED Review Details
04/23/2026 RIGHT-OF-WAY REVIEW v.1 04/28/2026 REQUIRES RESUBMIT Review Details
05/06/2026 RIGHT-OF-WAY REVIEW v.2 05/11/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00705
Permit Status: Fees due
Permit Description: PRJ314460-1: Cox to Overlash 1,750 of existing CATV fiber, intercept & pull thru 675' of existing fiber for system tie.
Total Outstanding Activity Conditions - 10
Date Name
04/23/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/23/2026 Traffic control set-up approved between 9AM - 3:30PM
04/23/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/23/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/23/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/15/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ€“ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ€“ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ€“ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
05/15/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/15/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
05/15/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)
05/15/2026 Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations. Rolling shadow traffic control closures not to exceed 2 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 2 hrs will require full traffic control setups based on road configuration

Documents

File Name Document Type  
PRJ314460-1 PLANS_V1.PDF DOCUMENTS VIEW
PRJ314460-1 REV TCP_V3.PDF DOCUMENTS VIEW