Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1831 S SARNOFF DR
Apply Date:
04/20/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
CITY PM PROJECT: ARTURO LEDESMA . WO T169014. TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR, INSTAL UG SECONDARY EQUIPMENT AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.

Permit Reviews

Permit Number - TR-UTL-0426-00685
Permit Status: Complete
Permit Description: CITY PM PROJECT: ARTURO LEDESMA . WO T169014. TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR, INSTAL UG SECONDARY EQUIPMENT AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Start Date Submittal Complete Date Status  
04/21/2026 RIGHT-OF-WAY REVIEW v.1 04/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00685
Permit Status: Complete
Permit Description: CITY PM PROJECT: ARTURO LEDESMA . WO T169014. TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR, INSTAL UG SECONDARY EQUIPMENT AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Total Outstanding Activity Conditions - 8
Date Name
04/21/2026 Traffic control set-up approved between 9AM - 3:30PM
04/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/21/2026 IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
04/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/21/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/22/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
04/22/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
04/22/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0426-00685
Permit Description: CITY PM PROJECT: ARTURO LEDESMA . WO T169014. TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR, INSTAL UG SECONDARY EQUIPMENT AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/29/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Ramey, aiming for 5/8 mobilization, will need stamped TCP before barricade set up
06/29/2026 TRSP - ROW - Barricade Takedown Passed all devices have been removed from site
06/29/2026 TRSP - ROW - Backfill - Placement/Compaction Passed backfills all completed in landscape areas, approved
06/29/2026 TRSP - ROW - Final Passed all work completed, job site is clear of devices and debris, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
CITY ROW PERMIT MAP T169014_V1.PDF DOCUMENTS VIEW
DB 72356 - 1831 S SARNOFF DR - NB RLC - T169014_V1.PDF DOCUMENTS VIEW