Permit: TR-UTL-0426-00679
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
2150 E BROADWAY BL
Address NEW:
2150 E BROADWAY BL
Apply Date:
04/17/2026
Applicant:
Cox Communications
Description:
PRJ314266-1: Cox to overlash 1,650 of CATV fiber for system tie. (Start Date 7/20/2026 - Per Direction of Prop 411 PM)
Permit Reviews
Permit Number - TR-UTL-0426-00679
Permit Status: Fees due
Permit Description: PRJ314266-1: Cox to overlash 1,650 of CATV fiber for system tie.
(Start Date 7/20/2026 - Per Direction of Prop 411 PM)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/22/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00679
Permit Status: Fees due
Permit Description: PRJ314266-1: Cox to overlash 1,650 of CATV fiber for system tie.
(Start Date 7/20/2026 - Per Direction of Prop 411 PM)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 04/20/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 04/20/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 04/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/20/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 04/20/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/21/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/21/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |