Permit: TR-UTL-0426-00606
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1502 S BEVERLY AV
Address NEW:
1502 S BEVERLY AV
Apply Date:
04/01/2026
Applicant:
Austin Eslick
Description:
T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole. 10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0426-00606
Permit Status: Complete
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00606
Permit Status: Complete
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/03/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 04/03/2026 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced |
| 04/03/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 04/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0426-00606
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | no access to alleyways needed for any services so alleyways do not have closures. No travel lanes between alleyways need closures, so flaggers in advanced warnings are not needed. Snow fencing in use within alleyways for excavations, poles and equipment are in place. | |
| 09/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre-con meeting held, phone call with Cody from TEP confirmed job has started | |
| 10/05/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all poles and backfill in alleyway landscape completed | |
| 10/07/2026 | TRSP - ROW - Final | Passed | all work completed, devices and debris removed from site, approved |