Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1502 S BEVERLY AV
Apply Date:
04/01/2026
Applicant:
Austin Eslick
Description:
T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole. 10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0426-00606
Permit Status: Complete
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole. 10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
04/01/2026 RIGHT-OF-WAY REVIEW v.1 04/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00606
Permit Status: Complete
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole. 10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 5
Date Name
04/03/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
04/03/2026 Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced
04/03/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/03/2026 Traffic Control set-up approved between 7AM - 5PM
04/03/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0426-00606
Permit Description: T147201 - Crews to park in the City of Tucson ROW to replace (12) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (1) pole locations. Risers to be replaced at (0) pole locations. No sidewalk impact. 2’x2’ excavations per pole. 10/01/26- renew permit for 30 days as of 10/01/26 new expiration date is 10/31/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/24/2026 TRSP - ROW - Barricade - Setup/Routine Passed no access to alleyways needed for any services so alleyways do not have closures. No travel lanes between alleyways need closures, so flaggers in advanced warnings are not needed. Snow fencing in use within alleyways for excavations, poles and equipment are in place.
09/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed no pre-con meeting held, phone call with Cody from TEP confirmed job has started
10/05/2026 TRSP - ROW - Backfill - Placement/Compaction Passed all poles and backfill in alleyway landscape completed
10/07/2026 TRSP - ROW - Final Passed all work completed, devices and debris removed from site, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
AERIAL PERMIT MAP_WO T147201_V1.PDF DOCUMENTS VIEW
DB 71771 - 1502 S BEVERLY AVE - VARIOUS - T147201_V1.PDF DOCUMENTS VIEW