Permit: TR-UTL-0425-00712
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
460 W 19TH ST
Address NEW:
460 W 19TH ST
Apply Date:
04/30/2025
Applicant:
Adrien Pineda
Description:
SI HP (2024) - 19TH ST (MIDTOWN FDR PHASE 9) - SYSTEM IMPROVEMENT -APPROX. 1,550 FT OF BORING UNDER PAVEMENT WITH AN APPROX. 200 FT TRENCH IN PAVEMENT -APPROX. 1,570 FT OF OPEN TRENCH UNDER PAVEMENT -APPROX. 12 FT OF OPEN TRENCH IN DIRT *ADOT PERMIT IS IN PROCESS, AS WELL AS ARCHEOLOGICAL REQUIREMENTS*
Permit Reviews
Permit Number - TR-UTL-0425-00712
Permit Status: Inspections
Permit Description: SI HP (2024) - 19TH ST (MIDTOWN FDR PHASE 9) - SYSTEM IMPROVEMENT
-APPROX. 1,550 FT OF BORING UNDER PAVEMENT WITH AN APPROX. 200 FT TRENCH IN PAVEMENT
-APPROX. 1,570 FT OF OPEN TRENCH UNDER PAVEMENT
-APPROX. 12 FT OF OPEN TRENCH IN DIRT
*ADOT PERMIT IS IN PROCESS, AS WELL AS ARCHEOLOGICAL REQUIREMENTS*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/04/2025 | APPROVED |
| 04/30/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/03/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00712
Permit Status: Inspections
Permit Description: SI HP (2024) - 19TH ST (MIDTOWN FDR PHASE 9) - SYSTEM IMPROVEMENT
-APPROX. 1,550 FT OF BORING UNDER PAVEMENT WITH AN APPROX. 200 FT TRENCH IN PAVEMENT
-APPROX. 1,570 FT OF OPEN TRENCH UNDER PAVEMENT
-APPROX. 12 FT OF OPEN TRENCH IN DIRT
*ADOT PERMIT IS IN PROCESS, AS WELL AS ARCHEOLOGICAL REQUIREMENTS*
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/30/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Christopher Blue at with PDSDHistoric@tucsonaz.gov any questions. |
| 04/30/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/07/2025 | S Kroeger Ln is subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
| 05/07/2025 | W 18th St and W 19th St west of the freeway is subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0425-00712
Permite Description: SI HP (2024) - 19TH ST (MIDTOWN FDR PHASE 9) - SYSTEM IMPROVEMENT
-APPROX. 1,550 FT OF BORING UNDER PAVEMENT WITH AN APPROX. 200 FT TRENCH IN PAVEMENT
-APPROX. 1,570 FT OF OPEN TRENCH UNDER PAVEMENT
-APPROX. 12 FT OF OPEN TRENCH IN DIRT
*ADOT PERMIT IS IN PROCESS, AS WELL AS ARCHEOLOGICAL REQUIREMENTS*
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | TRSP - ROW - Barricade Takedown | N/A | Re-inspection required | |
| 11/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 12/04/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0425-00712
Permit Description: SI HP (2024) - 19TH ST (MIDTOWN FDR PHASE 9) - SYSTEM IMPROVEMENT
-APPROX. 1,550 FT OF BORING UNDER PAVEMENT WITH AN APPROX. 200 FT TRENCH IN PAVEMENT
-APPROX. 1,570 FT OF OPEN TRENCH UNDER PAVEMENT
-APPROX. 12 FT OF OPEN TRENCH IN DIRT
*ADOT PERMIT IS IN PROCESS, AS WELL AS ARCHEOLOGICAL REQUIREMENTS*
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |