Permit: TR-UTL-0425-00708
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4909 E BROADWAY BL
Address NEW:
4909 E BROADWAY BL
Apply Date:
04/29/2025
Applicant:
Cox Communications
Description:
Cox to trench 20' to install conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0425-00708
Permit Status: Complete
Permit Description: Cox to trench 20' to install conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00708
Permit Status: Complete
Permit Description: Cox to trench 20' to install conduit for system tie.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/29/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/29/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/29/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/29/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 04/29/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00708
Permit Description: Cox to trench 20' to install conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Francisco with optimum over the phone. He confirmed that the work on this permit is done. It was finished on Friday, June 23. | |
| 06/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/16/2025 | TRSP - ROW - Final | Passed |