Permit: TR-UTL-0425-00697
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
840 W IRVINGTON RD
Address NEW:
840 W IRVINGTON RD
Apply Date:
04/28/2025
Applicant:
Cox Communications
Description:
PRJ292307-1 Cox to bore 50' to install new conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0425-00697
Permit Status: Complete
Permit Description: PRJ292307-1 Cox to bore 50' to install new conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00697
Permit Status: Complete
Permit Description: PRJ292307-1 Cox to bore 50' to install new conduit for system tie.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/28/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/28/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way |
| 04/28/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 04/28/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/28/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |
| 04/28/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00697
Permit Description: PRJ292307-1 Cox to bore 50' to install new conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/21/2025 | TRSP - ROW - Final | Passed |